Solar Installer in New Cumberland, PA: Start With Your Bill

Before you compare solar installers for a New Cumberland home, read your electric bill and your tax parcel. They settle which utility pays for your surplus solar, what that surplus is worth and which office issues the permit. The proposed service would size one design to your yearly use and price it four ways.

  • For New Cumberland homeowners comparing solar offers
  • One design priced as cash, loan, lease, PPA
  • Utility, zoning and floodplain answers before signing

Get your free quote Run the four-way check

The Susquehanna River from a riverside path in Harrisburg on an overcast early-autumn day, with fallen leaves on the grass, a large shade tree and the wooded far bank.

The local rule to check first

New Cumberland's ZIP is served by both Met-Ed and PPL, so check which one is on your bill. Any accessory solar there needs zoning approval.

Check your parcel and your bill before any quote

A quote with "New Cumberland" on it can rest on the wrong utility or the wrong municipality. Settle both before you compare prices. Each one changes a different line of the proposal.

Start with the bill. The state's shopping site, PAPowerSwitch, lists both Met-Ed and PPL Electric Utilities for ZIP 17070. Met-Ed is now a rate district of FirstEnergy Pennsylvania, so your bill may carry the FirstEnergy name instead. We could not find a street-level map showing where one utility ends and the other begins, so don't guess from your neighbor's bill. The distribution utility named on your own bill is the answer.

Then look for a second name on the same bill: your supplier.

  • The utility (the electric distribution company) owns the wires and the meter and runs net metering.
  • The supplier sells the generation, the energy itself. If your bill names a competitive supplier, called an electric generation supplier or EGS, that contract can change what your surplus solar earns.

Now the parcel. ZIP 17070 is also the mailing ZIP for Fairview Township, which sits across the county line in York County. New Cumberland borough is in Cumberland County. The borough rules on this page apply only to parcels inside the borough. If your parcel record shows a township instead, that township's office handles the permit, and its rules are not covered here.

Look the parcel up in the Cumberland County Property Mapper. You'll need the parcel ID anyway: the borough's zoning application asks for the one that lookup returns.

17070 isn't the only split-utility ZIP nearby; Mechanicsburg has one too. What 17070 adds is the county line, so a mailing address alone can point a quote at the wrong utility and the wrong permit office at once.

Kilowatt-hours past your yearly use earn less

Ask every installer for two numbers: how many kilowatt-hours (kWh) the system will make in a year, and how many your house used in the last 12 months. The gap between them decides how much of the system earns full price.

Pennsylvania's net-metering rule, 52 Pa. Code §75.13, works in two steps:

  1. Up to your yearly use, each kWh you send to the grid earns a full retail credit: generation, transmission and distribution charges included.
  2. Past your yearly use, the leftover credits are paid out once a year at the utility's price to compare. That is the default supply price per kWh, the number a competitive supplier has to beat.

The year in question is the compliance year, June 1 to May 31.

The two 17070 utilities pay different amounts for that leftover. PAPowerSwitch showed these residential prices to compare, valid through November 30, 2026:

Utility at the address Price to compare (year-end payout rate) Last updated
Met-Ed (FirstEnergy Pennsylvania) 13.951¢ per kWh October 15, 2026
PPL Electric Utilities 13.079¢ per kWh November 2, 2026

Both are due to change on December 1, 2026, so recheck the rate for your utility before relying on it. EcoGen's Pennsylvania solar incentives guide tracks both utilities' payout and battery rules in one place.

Compare that with what a kWh you use at home is worth. EcoGen models the all-in value of a solar kWh at 19.087¢ for Met-Ed and 18.286¢ for PPL (State benchmark, EcoGen September 2026 Edition, modeled). So a surplus kWh earns roughly 5 cents less than one that offsets your own use, at either utility (Illustrative calculation).

If you buy generation from an EGS, the rule changes. Section 75.13(f) says that what you are paid for excess generation "must be stated in the service agreement." Ask the supplier for that clause before you sign a solar contract, not after.

Size the system to 12 months of your own kWh. EcoGen gives the same advice: size to your usage, not your roof.

Worked example: one design, four ways to pay

Illustrative calculation. A New Cumberland borough home used 9,500 kWh in the last 12 months (Illustrative example). An installer proposes 8.26 kW DC, EcoGen's typical Pennsylvania system, priced at the $2.87 per watt state benchmark: $23,706 (State benchmark, modeled installed price before incentives, EcoGen September 2026 Edition). At EcoGen's statewide 1,399 kWh per kW per year, it makes about 11,556 kWh. A PPA is offered at 15.0¢ per kWh with a 2.9% yearly escalator (Illustrative example; EcoGen reports escalators of 1.9% to 2.9%).

Four terms before the table:

  • kW DC is the panels' rated size. Installers price it in dollars per watt ($/W).
  • A PPA (power-purchase agreement) means a company owns the panels on your roof and charges you for every kWh they produce. The escalator is that rate's yearly rise.
  • SRECs (solar renewable energy credits) are certificates earned for each 1,000 kWh a system makes. EcoGen puts the recent average near $28.26 per MWh, and the price swings widely.
  • A dealer fee is a charge some solar lenders fold into the loan principal.
Step (Illustrative calculation) PPL address Met-Ed address
Production vs 12-month use 11,556 − 9,500 = 2,056 kWh surplus 2,056 kWh surplus
Year-end payout rate (through Nov 30, 2026) 13.079¢ 13.951¢
What the surplus earns $268.90 $286.83
What a 15.0¢ PPA charges for the same kWh $308.40 $308.40
Year-one result on surplus kWh under the PPA −$39.50 −$21.57
PPA rate in year 10 at 2.9% a year about 19.4¢ about 19.4¢
Right-sized owned system 9,500 ÷ 1,399 ≈ 6.79 kW × $2.87/W ≈ $19,487, or $4,219 less same
What the extra 1.47 kW earns a year $268.90 + about $58 in SRECs ≈ $327 $286.83 + about $58 ≈ $345
Simple payback of the extra panels alone $4,219 ÷ $327 ≈ 12.9 years $4,219 ÷ $345 ≈ 12.2 years

Read the rows against each way to pay.

  • PPA. You pay 15.0¢ for kWh the utility buys back at 13 to 14¢. The surplus costs more than it earns in year one at either address, and the escalator widens the gap every year. Nobody can tell you what the payout rate will be in 2036.
  • Cash. The extra 1.47 kW costs about $4,219 and earns only the surplus rate plus SREC income, hence the long payback on those panels.
  • Loan. EcoGen reports dealer fees of 15% to 30% of principal. At a 20% fee, the borrower needs about $5,274 of principal to pay for that same $4,219 of extra panels (Illustrative calculation: $4,219 ÷ 0.80).
  • Lease. A lease is a fixed monthly rent for panels someone else owns. We won't put a number on it, because the payment is set from the system offered. Oversize the system and the rent rises, while the extra kWh still earn only the payout rate.

None of this makes a PPA, lease or loan the wrong choice. The surplus row decides how much of each offer is worth paying for, and that row depends on which utility bills you. A Met-Ed address loses a little less on the surplus than a PPL address, but neither comes out ahead.

What the proposed service would put in writing

Proposed service. Solar Grids Central PA is a proposed service; coverage of New Cumberland is proposed and not yet confirmed. Here is what it would hand you before anything is signed.

The core is the four-way comparison sheet: one frozen design (same roof faces, equipment, kW DC and yearly kWh) priced as cash, loan, lease and PPA, so only the money terms differ. Each column would show the upfront cost, the first monthly payment, the escalator, the term, the total paid, any dealer or financing fee in dollars, and who keeps the SRECs. For a New Cumberland address, the sheet would add these rows:

  • Utility and supplier, copied from your bill, with the payout rate and the date it was checked.
  • Proposed production vs your 12-month use, with any surplus valued at that utility's price to compare, not at retail.
  • PPA and lease rate vs the payout rate in year one and year 10, so you can see where the surplus starts costing more than it earns.
  • Responsibility rows, each with a named owner: the borough zoning application (including the roof-coverage percentage), plan review and inspections by Approved Code Services, the floodplain check, and the utility interconnection and net-metering application.
  • Battery as a separate, optional line, with battery pay counted only where a program is open. Today that means PPL addresses.
  • Home sale: what happens to each option if you sell, such as a buyout or a transfer.

The assessment itself would follow a "sign nothing yet" rule: no credit pull and no contract at the visit.

Check the price per watt before comparing payments

Check the cash price before comparing monthly payments. An inflated system price carries into every column: the loan principal, the lease rent and the PPA rate are all built on it. Do the division yourself:

  1. Remove every line that isn't solar: battery, re-roof, main panel upgrade, and any electrical work a floodplain review requires, such as raising a breaker panel.
  2. Divide the remaining cash price by the system's DC watts.
  3. Compare the result with the state benchmark.

EcoGen's September 2026 Edition puts Pennsylvania at $2.87/W, with typical quotes between $2.56 and $3.16/W (State benchmark, modeled installed price before incentives; not a quote, and not specific to New Cumberland).

Quote check (Illustrative calculation). A $25,600 cash quote for 8.26 kW DC works out to $25,600 ÷ 8,260 W = $3.10/W. That is inside EcoGen's band and $0.23/W above the benchmark. Ask what the extra buys; it is no reason to walk away.

Now suppose that $25,600 included a $13,500 battery (EcoGen's modeled price). The solar part would be $12,100, about $1.46/W. A result that far below the band signals a mis-split quote; ask for a corrected breakdown before you compare anything else.

Look at the permit line too. In the permit cost sketch below, the borough and Approved Code Services fees come to about $445 (Illustrative calculation). A permit line far above that should come with a list of what it covers.

The borough permit: zoning first, then Approved Code Services

In the borough, solar needs zoning approval before building code review starts. Check that the installer's schedule follows that order.

"All permits start in the Borough Office" at 1120 Market Street, according to the borough's Codes Enforcement and Zoning department. The Zoning Enforcement Officer handles zoning. The building code official is Approved Code Services, a third-party firm that reviews plans and inspects work under Pennsylvania's Uniform Construction Code (UCC).

Zoning comes first because of Zoning Ordinance 727, adopted July 9, 2025. Section 316.L requires zoning approval for any accessory solar facility "on any roof, site, or lot." The application must show the location, "including the percentage of roof coverage": how much of the roof the array covers. The applicant must also show that impacts on neighbors are minimized, through siting, design, buffering or screening. Small solar systems are a permitted use in the R1, R2, MU, I and IC districts.

The borough's permit forms set the order:

  1. Zoning application with a plot plan, the parcel ID and a floodplain yes or no. If the owner isn't doing the work, the form asks for the contractor's Pennsylvania license and certificate of insurance. Pennsylvania has no statewide solar license; home improvement contractors register with the Attorney General, so expect that registration number.
  2. Building permit application, filed with four plan sets: one for the borough and three for Approved Code Services. The zoning packet says building plans "will not be submitted" to the third-party reviewer until zoning is approved.
  3. No work until the official permit is issued.

What the borough and Approved Code Services charge

Fee Amount Source
General zoning permit $40 Borough fee schedule
Building permit administration $25 Borough fee schedule
Residential alteration fee $35 Approved Code Services, 2026
Residential plan review $115 per hour Approved Code Services, 2026
Residential inspection $115 per hour; failed inspections billed the same Approved Code Services, 2026

Permit cost sketch (Illustrative calculation): $40 + $25 + $35 + one hour of plan review ($115) + two one-hour inspections ($230) ≈ $445. The hours are assumed. A failed inspection adds another hourly charge, so ask the installer who pays for it.

A few rules matter only for some homes. Ground-mounted arrays may cover no more than 30% of the lot and must meet the accessory setbacks, with a 10-foot minimum. The borough's 2023 design guidelines prefer rooftop features out of street view, but they are advisory, written mainly for downtown, and the borough has no architectural review board; the §316.L impact standard still applies. On the utility side, certified inverter systems up to 10 kW get Level 1 interconnection review; larger ones go to Level 2.

Floodplain addresses: where the inverter, battery and breaker panel sit

If your home is near the Susquehanna River or Yellow Breeches Creek, ask about the floodplain before the design is frozen. It can decide where the equipment goes.

The borough's floodplain management page links the FEMA map lookup. The zoning form asks whether the property is in the floodplain, and for an elevation certificate if it is.

Floodplain Ordinance 716 sets the heights. Two terms first:

  • BFE (base flood elevation) is the height floodwater is expected to reach in the flood FEMA maps for that area.
  • Freeboard is a safety margin above it. New Cumberland uses 1.5 feet, so the Regulatory Flood Elevation is BFE + 1.5 ft. The ordinance says the margin also applies to utilities.

Under the ordinance, electrical and mechanical equipment may not sit below the Regulatory Flood Elevation, and electrical distribution panels must be at least 3 feet above BFE. A permit "shall be required before any construction or development is undertaken." For existing buildings, the floodplain administrator compares the cost of the work with the building's market value. Work reaching 50% of that value counts as a substantial improvement. The building permit form asks for the market value of floodplain properties.

We could not confirm how the administrator applies each clause to a rooftop retrofit. Ask before signing:

  • Does a rooftop array on my house need a floodplain permit?
  • Where may the inverter, disconnect and any battery go? Is a basement wall allowed?
  • Does the cost of solar count toward the 50% test?
  • If my breaker panel is below BFE + 3 ft, does adding solar trigger moving it?

Put the answers in the quote. A battery in a flood-zone basement is a different design, and a different price, from one on an upper floor.

Battery pay, rebates and the 30% credit depend on who bills you

Before a quote counts any incentive, check that it exists for your utility today.

PPL addresses. PPL's Optimized Battery program pays $150 per kW of battery each season, up to $400 a season. PPL says a typical home battery could earn $225 a season. Enrollment is open; from the January 2027 winter season, payments may be prorated by event participation. Per EcoGen's October 2026 check, PPL was enrolling Enphase and SolarEdge batteries only, so confirm your model with PPL. EcoGen found no PPL solar rebate.

Met-Ed addresses. FirstEnergy Pennsylvania's earlier solar incentive ran June 1, 2021 to April 1, 2026, according to its archived rebate page. A new measure approved March 12, 2026 was not yet open when EcoGen checked on October 1. We could not confirm an open FirstEnergy solar or battery incentive on November 18, 2026. Check FirstEnergy's Pennsylvania home programs page before any quote counts one.

The 30% federal credit. It is gone for systems you own. The IRS says the Residential Clean Energy Credit "is not available for any property placed in service after December 31, 2025." A 2026 cash or loan quote that subtracts 30% is using a credit you cannot claim. With a lease or PPA, the company that owns the panels may claim a business credit (Section 48E, per EcoGen), not you.

Price a battery as its own line. EcoGen models a 13.5 kWh battery at about $13,500 (State benchmark). At a PPL address, show the program income beside it with PPL's own numbers. At a Met-Ed address, show none until FirstEnergy publishes an open program.

New Cumberland quote checklist: ask before you sign

Use this with every proposal. The right column says who can confirm each answer, so a salesperson isn't your only source. The quote checklist on this site follows the same order.

Ask or check Who confirms it
Which utility delivers power: Met-Ed or PPL? Your bill
Who supplies generation, and does a supplier contract set the surplus payout? Your bill; your supplier agreement
Is the parcel in New Cumberland borough, and what is its parcel ID? Cumberland County Property Mapper
Proposed yearly kWh vs your last 12 months of use Installer, checked against your bills
Surplus kWh valued at this utility's price to compare, with its date Installer; PAPowerSwitch
Cash, loan, lease and PPA priced on the same design Installer
PPA or lease rate in year one and year 10, beside the payout rate Installer
Cash price per watt with battery, re-roof and panel work removed You, using the steps above
Dealer fee in dollars on any loan Installer; lender
Roof-coverage percentage on the zoning application Installer; Borough Office
Who files zoning, prepares four plan sets and pays failed-inspection fees Installer, in the contract
Floodplain status and equipment heights Floodplain administrator; Approved Code Services
Battery model eligible for PPL's program, or no battery income at a Met-Ed address PPL; FirstEnergy
Home improvement contractor registration number on the contract Installer; Attorney General's HIC search

Pennsylvania's Home Improvement Consumer Protection Act (HICPA) covers solar contracts: the contractor's registration number on the contract, three business days to cancel, and a deposit cap of one-third on contracts over $5,000. Ask whether those terms apply to a lease or PPA as well; we did not confirm that.

Question any proposal that shows:

  • A 30% federal tax credit on a system you would own.
  • A FirstEnergy solar or battery rebate you cannot find on FirstEnergy's own page.
  • "We'll fill the roof" sizing with no comparison to your 12 months of use.
  • No utility named, or a surplus valued at retail rather than the price to compare.
  • A building schedule that starts plan review before the borough's zoning approval.